Nortec SynPur User Manual
Page 22
Created: 21.12.2006
Changed: 21.03.2007
Printed: 02.03.2009
page 22 of 37
7 x 0,75
Junction box
1
1
2
2
3
4
4
5
5
6
P
E
Ready made-up cable
Cable plug 3
1
4
2
5
HPS 1
HPS 2
4 x 0,75
1
1
2
2
3
3 4
P
E
Cable plug
Junction box
Mal function
Maintenance
GLT
Included in the further scope of delivery of the SynPur are two pre-assembled
control cables (consisting of a 7-pin plug (for connection to the HPS) and a 3 m
long cable, as well as a 4-pin receptacle (service/fault outputs) and a 3 m long
cable) and a junction box.
4.3.1.1
Linking of fault and service outputs
The SynPur has a potential-free fault and service output. Both can be connected to
the building control system (GLT) in order to use the data for control or information
purposes.
No. Color
1
White
2
Yellow
3
Green
4
Brown
Figure 14: Linking to the GLT
Requirements of the GLT: The GLT must only supply two inputs for processing the
data.
Type of cable:
LIYY 4x 0.75 mm² (AWG 18)
Contact rating 250 V AC, 2A
4.3.1.2
Linking to the HPS
The SynPur is connected to the HPS over the 7-pin connector. In case of a fault
condition, the HPS is interrupted or turned off. The FWA of the HPS or the air
humidification remains on.
No. Color
1
White
2
Yellow
3
Green
4
Blue
5
Gray
6
Pink
7
Brown