beautypg.com

Nortec SynPur User Manual

Page 22

background image

Created: 21.12.2006
Changed: 21.03.2007
Printed: 02.03.2009

page 22 of 37

7 x 0,75

Junction box

1

1

2

2

3

4

4

5

5

6

P

E

Ready made-up cable

Cable plug 3

1

4

2

5

HPS 1

HPS 2

4 x 0,75

1

1

2

2

3

3 4

P

E

Cable plug

Junction box

Mal function

Maintenance

GLT

Included in the further scope of delivery of the SynPur are two pre-assembled
control cables (consisting of a 7-pin plug (for connection to the HPS) and a 3 m
long cable, as well as a 4-pin receptacle (service/fault outputs) and a 3 m long
cable) and a junction box.

4.3.1.1

Linking of fault and service outputs


The SynPur has a potential-free fault and service output. Both can be connected to
the building control system (GLT) in order to use the data for control or information
purposes.










No. Color
1

White

2

Yellow

3

Green

4

Brown




Figure 14: Linking to the GLT

Requirements of the GLT: The GLT must only supply two inputs for processing the
data.

Type of cable:

LIYY 4x 0.75 mm² (AWG 18)


Contact rating 250 V AC, 2A

4.3.1.2

Linking to the HPS


The SynPur is connected to the HPS over the 7-pin connector. In case of a fault
condition, the HPS is interrupted or turned off. The FWA of the HPS or the air
humidification remains on.






No. Color
1

White

2

Yellow

3

Green

4

Blue

5

Gray

6

Pink

7

Brown