Installation (cont.), Mounting cmw30 to roof structure (cont.) – MovinCool CMW30 User Manual
Page 15

15
INSTALLATION (cont.)
Mounting CMW30 to Roof Structure (cont.)
Example of Mounting without Pallet (cont.)
4. Insert the suspension rods
through the mounting holes of
the unit. Then install vibration
isolators, washers, nuts
(middle) and jam nut (bottom) to
be same level for all four
mounting positions.
5. Slowly lower the lifts.
6. Make sure the unit is level. Level must be less than 2° incline. If the unit is
not level, align the nut (middle) to level.
CAUTION: If level is more than 2° incline, condensation water
leakage may occur.
7. Tighten the jam nut (bottom).
Tightening torque for jam nut: Approx. 3.02 ft•lbf (4.1 N•m)
8. Tighten the nut (top) by hand until it is secured against the base frame.
SUSPENSION ROD
NUT (top)
MOUNTING HOLE
VIBRATION ISOLATOR
WASHER
NUT (middle)
JAM NUT (bottom)
ILL00356-00