B-Series DV-2 Gas Fireplace

Part No. XG0160 - 141231

Installation

B. Vertical (Through-The-Roof) Installations

Vertical Terminations must be installed:

• minimum 2' (two feet) above the highest point where vent

passes through the roof.

• minimum 6' (six feet) from a mechanical air inlet

• minimum 18" (1 1/2 feet) from a parapet wall.

Maximum vent height is 32 feet above fireplace.

Note: Flame characteristics will change if the maximum vent height

is used.

Minimum clearances 1" from vent to all combustible materials must

be maintained.

MEXT/PEXT

MEXT/PEXT

MXT-10/PXT-10

Figure 15. Vertical venting with 1 offset (1 offset= two 90° bends).

Figure 14. Straight, vertical venting showing required MXT-10 adaptor

(supplied with the MVTK-1 termination).

Figure 16. Vertical venting with 2 offsets (1 offset= two 90° bends).

4" / 7" Venting

A - Termination

MVTK-1

B - Stucco Kits

MSR (Stucco Frame)

MOSR (Stucco Can)

BSR ( Brick Can)

C - Flex Sections

MFL-1 (12" f/f Section)

MFL-2 (24" f/f Section)

MFL-3 (36" f/f Section)

MFL-4 (48" f/f Section)

D - Rigid Sections MEXT-1 (12" m/f Section)

MEXT-2 (24" m/f Section)

MEXT-3 (36" m/f Section)

MEXT-4 (48" m/f Section)

E - Support Ring

& Plate

MSPXT-7

F - Firestop

FS-7

G - Roof Flashing MRF-7 (1/12 - 7/12 pt.)

MRF-12 (7/12 - 12/12 pt.)

MEXT-6 (72" m/f Section)

MFL-6 (72" f/f Section)

A maximum of two offsets (each offset has two 90° bends) may be

made and shall not exceed total length of 25% of the vertical vent

height, when measured center to center of piping.

Example:

Typical vent installation.

20' vertical vent

2 - 2' offsets required

25% of 20' = 5' max. offset allowed

This venting configuration meets requirements.