beautypg.com

Section 3-3-2: venting components, Section 3-3-2: venting components 17, Installation – Montigo H38DF User Manual

Page 17

background image

Page 17

XG0147 - 150204.1

H*38DF Gas Fireplace

Installation

A - Termination

PTO4 (3" Length)

PTO4F (3" Length)

PVTK1SS

B - Frame Kits

MSR (Stucco Frame)

MOSR (Stucco Frame)

BSR-4 (4" Brick Frame)

BSR-6 (6" Brick Frame)

C - Flex Sections

PFL - 1 (12" f/f Section)

PFL - 18 (18" f/f Section)

PFL - 2 (24" f/f Section)

PFL - 3 (36" f/f Section)

PFL - 4 (48" f/f Section)

PFL - 6 (72" f/f Section)

D - Rigid Sections

PXT - 5 (5" f/f Section)

PXT - 10 (10" f/f Section)

PXT - 20 (20" f/f Section)

PEXT - 1 (12" f/m Section)

PEXT - 2 (24" f/m Section)

PEXT - 3 (36" f/m Section)

PEXT - 4 (48" f/m Section)

PEXT - 6 (72" f/m Section)

E - Elbows

PEL-90MM (m/m 90º Elbow)

PEL-90FF ( f/f 90º Elbow)

PEL-90FM ( f/m 90º Elbow)

PEL-45FM ( f/m 45º Elbow)

F - Support Ring & Plate PSPXT-8
G - Firestop

FS-8

H - Roof Flashing

PRF-7 (1/12 - 7/12 pt.)

PRF-12 (7/12 - 12/12 pt.)

I - Heat Shield

RHS101

J - Heat Guard

MTKOG

Connection and installation of the vent components should

adhere to the following guidelines:

„

Montigo recommends the use of a flex section for the final pipe

connected directly to the fireplace offering greater flexibility of

installation and absorption of movement.

„

Firestops must be installed as required by National & local codes

.

„

Montigo recommends that all exterior corners and joints be sealed

with exterior caulking. However, we encourage you to consult

your Building Envelope Engineer or Waterproofing Consultant

for further recommendations.

Section 3-3-2:

Venting Components

The following components and associated Montigo part numbers for

installation of a roof or wall mounted termination. Use only Montigo

Vent Components. Use of non-Montigo parts will VOID the warranty

and may impede operation of the fireplace.

„

Use any combination of rigid and flex pipe as required and in

any orientation (Male connectors can face in any direction).

„

Flex sections may be stretched up to 50% of their total length

(e.g. a 24” section maybe stretched to 36”).

„

Connect all vent sections using a minimum of three sheet metal

screws on the outer pipe flue.

„

Ensure the pipe ends male to female slide in a minimum of 1

1/2” of overlap.

„

Ensure all horizontal runs are supported with a minimum of 3

supports per 10’ of venting.

„

When hanging/ supporting venting, ensure that 1” clearance

is maintained on sides and bottom of vent runs and 2” above

horizontal vent runs to any combustible material.

„

Rigid pipe may be cut less than half way from the female end only.

„

Ensure when cutting sections of rigid pipe to maintain integrity

of internal supports.

„

Place the springs, supplied with the pipe kit, between the outer

and inner pipes to keep the pipes separate and avoid any

possible hot spots.

IMPORTANT:

Please Refer to your Building Envelope Engineer

or Waterproofing Consultant for a review of ALL

penetrations through exterior walls or the roof.

This manual is related to the following products: