Optional – Ivoclar Vivadent IPS e.max CAD Chairside User Manual
Page 36
36
Optional
Adjustments with IPS e.max CAD Crystall./Add-On
For minor shape adjustments (e.g. proximal or occlusal contact points), IPS e.max CAD Crystall./Add-On is
available . The adjustments may be made with both Crystallization/Glaze and Corrective firing.
Processing:
– Mix IPS e.max CAD Crystall./Add-On with IPS e.max CAD Crystall/Add-On Liquid to an easy-to-contour
consistency.
– Ensure even mixing of the add-on material and the liquid in order to achieve an optimum firing result.
– Apply the mixed add-on material directly on the unfired Glaze Paste and/or Shades and Stains in the areas to be
adjusted and fire.
– If the Glaze Spray is used, apply the Shades and Stains first. Subsequently, supplement the missing areas using Add-On.
Apply the Glaze Spray immediately after the application of the Add-On and fire.
– Conduct the Combination firing (crystallization/glaze HT/LT) after the application of Add-On on the «blue», non-
crystallized restoration.
– Conduct the Corrective firing if Add-On is applied on an already crystallized restoration.
– Speed Crystallization/Glaze Spray must not be used in conjunction with the Add-On.
Mix IPS e.max CAD Crystall/Add-On with IPS e.max CAD
Crystall/Add-On Liquid to an easy-to-contour consistency.
Application of the mixed Add-On on the blue restoration
before crystallization
Application of the mixed Add-On on the crystallized
restoration
Firing parameters for the Corrective firing
Furnace
Programat
CS/CS2
Program 2
Stand-by
temperature
B
[°C/°F]
403/757
Closing time
S
[min]
6:00
Heating rate
t
1
[°C/°F/min]
90/162
Firing
tempera-
ture
T
1
[°C/°F]
820/1508
Holding
time
H
1
[min]
0:10
Heating rate
t
2
[°C/°F/min]
30/54
Firing
tempera-
ture
T
2
[°C/°F]
840/1544
Holding
time
H
2
[min]
3:00
Vacuum 1
1
1
[°C/°F]
1
2
[°C/°F]
550/820
1022/1508
Vacuum 2
2
1
[°C/°F]
2
2
[°C/°F]
820/840
1508/1544
Long-term
cooling
L
[°C/°F]
700/1292
Cooling rate
t
l
[°C/°F/min]
0
Firing parameters Crystallization / Glaze HT/LT
Furnace
Programat
CS/CS2
Program 1
Stand-by
temperature
B
[°C/°F]
403/757
Closing time
S
[min]
6:00
Heating rate
t
1
[°C/°F/min]
90/162
Firing
tempera-
ture
T
1
[°C/°F]
820/1508
Holding
time
H
1
[min]
0:10
Heating rate
t
2
[°C/°F/min]
30/54
Firing
tempera-
ture
T
2
[°C°/F]
840/1544
Holding
time
H
2
[min]
7:00
Vacuum 1
1
1
[°C/°F]
1
2
[°C/°F]
550/820
1022/1508
Vacuum 2
2
1
[°C/°F]
2
2
[°C/°F]
820/840
1508/1544
Long-term
cooling
L
[°C/°F]
700/1292
Cooling rate
t
l
[°C/°F/min]
0