Delta MCS-1800 User Manual
Page 4
DELTA MCS 1800 3U Power Shelf
Installation, Operations and
Maintenance Manual
INDEX ii
T
T
T
a
aa
b
bb
l
ll
e
ee
o
oo
f
ff
C
C
C
o
oo
n
nn
t
tt
e
ee
n
nn
t
tt
s
ss
6.6 Battery String Connections (System equipped
----------------------------------------------
6.7 Temperature and Alarm Connections
----------------------------------------------
6.8 EXT. Breaker trip signal I/P Connector Wiring
----------------------------------------------
6.9 AC High Voltage Aux. Relay Output Wiring
----------------------------------------------
7. System Start –Up Procedure
---------------------------------------------- 7-1
7.1 Initial Start-Up Preparation
----------------------------------------------
7-1
7.3 Basic Functional Verification 7.2 No Load
Start-Up
----------------------------------------------
7-1
7.4 DC Load Connections
----------------------------------------------
7-1
7.5 System Functionality Check
----------------------------------------------
7-1
7.6 System Operation
----------------------------------------------
7-1
8. System Alarms and Troubleshooting
---------------------------------------------- 8-1
8.1 AC Fail Voltage Alarm Description
----------------------------------------------
8.2 High Voltage Shutdown Alarm
----------------------------------------------
8.3 High Voltage Alarm Description
----------------------------------------------
----------------------------------------------
8.5 Low Voltage Disconnect Alarm (System
----------------------------------------------
8.6 Fuse Fail Alarm (System equipped with PDU)
----------------------------------------------
----------------------------------------------
----------------------------------------------
---------------------------------------------- 9-1
----------------------------------------------
9.2 Removing and Replacing a Rectifier Unit
----------------------------------------------
10. Acronyms and Abbreviations
----------------------------------------------