beautypg.com

750at – Cybex 750AT Arc Trainer User Manual

Page 28

background image

Cybex Arc Trainer 750A/750AT Owner’s Manual

28

Place left handle assembly in position and slide pivot pin back in place. Refer to diagram under

3.

step one above.
Secure handle assembly with the screws and washers removed in step 2 of

4.

Remove left and

right handle assembly . Refer to diagram under step one above.
Locate left linkage rod, left handle assembly,

5.

linkage rod cap 2.00 OD (#20), flange spacer (#17),

SHCS .250-20 UNC-3A SS (#19), and flat washer .281 ID x .500 OD x .062 T (#18). Refer to

diagram under step two above.
Place a drop of loctite (#16) on each

6.

SHCS .250-20 UNC-3A SS (#19) and another drop inside the

shaft into which the SHCS (#19) will be tightened.
Using a 3/16” Allen wrench (#7), secure linkage rod to handle assembly with

7.

linkage rod cap 2.00

OD (#20), flange spacer (#17), SHCS .250-20 UNC-3A SS (#19) and flat washer, .281 ID x .500

OD x .062 T (#18).

(Both Sides–Left Side Shown)

#20

#17

#18

#19

Loctite

(#16)

NOTE: The

SHCS .250-20 UNC-3A SS

(#19)

must be tightened to a minimum

of 90 in/lbs.

750AT

Verify the

8.

SHCS .250-20 UNC-3A SS (#19) are tightened to a minimum of 90 in/lbs.