Optional blower installation, Continued – Desa (V) CD36R(N User Manual

Page 18

background image

18

www.desatech.com

116035-01B

OPTIONAL BLOWER INSTALLATION (Cont.)

Models BK and BKT

OPTIONAL BLOWER INSTALLATION

Continued

4. Be certain that all wire terminals are securely attached to ter-

minals on blower motor and that the screw retaining the green

ground wire is tight.

5. Mount speed control box by placing the plastic control shaft

through the opening in switch bracket (see Figure 34) or

the igniton module bracket (see Figure 35).

6. While supporting speed control, secure control shaft with lock

nut by pushing and turning lock nut with pliers clockwise until it

is tight against front panel. Place control knob provided on shaft.
7. Turn on power to dulex outlet if previously turned off per the

warning in column 1, page 17.

8. Plug in blower power cord.

a. If your firebox is installed as a freestanding unit with an

accessory mantel, determine whether the power cord will

exit the left side or the right side of the firebox. Route power

cord through exit hole and plug the power cord into a wall

receptacle near the firebox.

b. If your firebox installation is recessed and/or pre-wired,

plug the power cord into the duplex outlet provided. Refer to

Electrical Supply Connection, page 17 for instructions on

wiring the duplex box.

9. Check to make sure that the power cord is completely clear of the

blower wheel and that there are no other foreign objects in blower

wheel. Turn blower on and check for operation. Turn blower off

by turning knob fully counterclockwise before continuing.

10. Peel off the backing paper and stick the supplied wiring dia-

gram decal on the firebox bottom approximately 6” in front

of the blower (see Figure 36).

CAUTION: Never touch the blower wheel while in

Operation.

Speed Control

Control

Shaft

Locknut

Control

Knob

Switch

Bracket

Blower

Plug-In

Duplex Outlet
(Located underneath
firebox floor against
lower right outside wall)

Model BKT Installation
Note:

When installing the BKT thermostatically-controlled blower,

you must first secure the thermal switch bracket to the blower. If it

has not already been factory installed.

Follow all instructions provided in the blower accessory kit:
1. Place the green ground wire with ring terminal between the

bottom hole on the thermal switch bracket and the top ear hole

on the blower assembly. Insert the phillips screw into all three

pieces and tighten securely (see Figure 37, page 19).

2. Connect wire harness and power cord terminals. Connect the

blue jumper wire to the blower motor terminal and the right

side terminal of the thermal switch. Connect the black wire to

the left side of the thermal switch and the white wire to the

other remaining blower motor terminal.

Note:

The power cord outer insulation sleeve may have to be

stripped slightly to allow enough wire length to reach and make all

connections. DO NOT trim excessive length away. Just enable

enough to make all connections securely.
3. Place the blower against the lower rear wall of the firebox outer

wrapper with the exhaust port directed upward and the thermodisc

poaitioned up near the fireplace bottom. The thermodisc must be

oriented near the fireplace bottom as shown in Figure 37, page

19, in order to sense temperature and properly operate. The blower

will be held in position against the back wall by the magnets

incorporated onto the blower housing (see Figure 37, page 19).

Wiring Diagram Decal
6" in Front of Blower

Figure 34 - Attaching Speed Control to Fireplace

(Millivolt Models (VCD36R and VCD36T)

Figure 36 - Locating Wiring Diagram Decal

Speed Control

Control
Shaft

Locknut

Control Knob

Blower
Plug-in

Duplex
Outlet

Ignition Module
Bracket

Figure 35 - Attaching Speed Control to Fireplace