beautypg.com

2 to start the process, 3 to stop the process, 4 how to leave system overnight – Bronkhorst Vapor Delivery Module User Manual

Page 14: 5 to empty and purge the system, To start the process, To stop the process, How to leave system overnight, To empty and purge the system, Bronkhorst

background image

Bronkhorst®

Vapor Delivery Module

9.17.079

14

4.6.1.2 To start the process

Procedure:

Actions:

B1

Set the heater at right temperature

Give set point to the heater; wait until the temperature is

stabilized

B2

Start gas flow

Give setpoint to MFC

Make sure that the carrier gas is always flowing when the

liquid flow is on. Preferably, let always gas flow in the

carrier gas line when the system is filled with liquid.

B3

Start liquid flow

Give setpoint LFC, wait until stabilization

Close supply pressure of the liquid vessel during the process.

The pressure controller of the inert gas supply can influence

the stability of the liquid flow controller.

B4

Connect process

Open V7, close V6

4.6.1.3 To stop the process

Procedure:

Actions:

C1

Disconnect process

Open V6, close V7

C2

Stop liquid flow

Give setpoint = 0 to LFC

C3

Optional: Stop gas flow

Give setpoint = 0 to MFC

Make sure that the carrier gas is always flowing when the

liquid flow is on. Preferably, let always gas flow in the

carrier gas line when the system is filled with liquid.

4.6.1.4 How to leave system overnight

Procedure:

Actions:

D1

Relief the supply pressure from the liquid- and

carrier gas lines

Close V2 and V3

4.6.1.5 To empty and purge the system

Procedure

(1,2)

:

Actions:

E1

Relief the supply pressure from the liquid- and

carrier gas lines

Close V2 and V3

E2

Purge liquid out of lines

Open V1 and V5

E3

Purge lines with inert gas

Open V4, V6
Close V7
Give setpoint to MFC

E4

Optional: purge wit inert liquid

Connect inert liquid to inert gas supply, Proceed according

to E2

E5

Optional: Alter E3 and E4 for a few times

(1)

If the liquid is reactive or aggressive, be sure to remove air (and water vapor) carefully, before introducing

liquid in the system.

(2)

If the liquid is reactive, aggressive, poisonous, toxic, or flammable, beware that the system is purged fully

(preferably with inert liquid, E3, E4, E5) before opening the system.

- In case of non-pure liquids, place a filter upstream the liquid flow controller.

- Mount the Vapor Delivery Module upright.