2 installation, 1 receipt of equipment, 2 return shipment – Bronkhorst Mass Flow User Manual
Page 15: 3 service, 4 mounting
BRONKHORST HIGH-TECH B.V.
2 Installation
2.1 Receipt of equipment
Check the outside packing box for damage incurred during shipment. Should the packing box be damaged,
then the local carrier must be notified at once regarding his liability, if so required. At the same time a report
should be submitted to:
BRONKHORST HIGH-TECH B.V.
RUURLO HOLLAND
If applicable, otherwise contact your distributor.
Remove the envelope containing the packing list; carefully remove the equipment from the packing box.
Do not discard spare or replacement parts with the packing material and inspect the contents for damaged or
missing parts.
2.2 Return shipment
When returning material, always describe the problem and if possible the work to be done, in a covering
letter.
It is absolutely required to notify the factory if toxic or dangerous fluids have been metered with the
instrument!
This to enable the factory to take sufficient precautionary measures to safeguard the staff in their repair
department. Take proper care of packing, if possible use the original packing box; seal instrument in plastic
etc.
Contaminated instruments must be dispatched with a completely filled in 'declaration on
contamination form'.
Contaminated instruments without this declaration will not be accepted.
Note:
If the instruments have been used with toxic or dangerous fluids the customer should pre-clean the
instrument.
Important:
Clearly note, on top of the package, the customer clearance number of Bronkhorst High-Tech B.V., namely:
NL801989978B01
If applicable, otherwise contact your distributor for local arrangements.
2.3 Service
If the equipment is not properly serviced, serious personal injury and/or damage to the equipment could be
the result. It is therefore important that trained and qualified service personnel perform servicing.
Bronkhorst High-Tech B.V. has a trained staff of servicemen available.
2.4 Mounting
The mounting position depends on the type of instrument. For flowmeters the preferred position is horizontal,
and at high pressures all meters should be mounted in this position (exception: COMBI-FLOW series to be
mounted vertically). Avoid installation in close proximity of mechanic vibration and/or heat sources.
9.17.001
page 15