Sam ple proj e c t – Argox Architect 1.11 User Manual
Page 49

45
A
RCHITECT
®
U
SER
’
S
M
ANUAL
4
Sam
ple
Proj
e
c
t
• Select Logistics > Operator
= * (multiplication); With
Node = Amount.
 
 
• On the Compare page,
configure: Condition = <; 
With Constant = 
“500”.
8. Create a display node.
• Name it “ADDCharge”. 
• Create the display text and set the time. 
9. Create link nodes.
• Link Item_ID to Quantity. 
• Link Quantity to Amount. 
• Link Amount to Total. 
• Link Total to ADDCharge. 
• Link Total to Item_ID. 
• Double-click Item_ID and go to the Link page. 
• Select Link Out > Quantity > Condition = Verify Node; 
Node Status = Succeed.
• Double-click Total and go to the Link page. 
• Select Link Out > ADDCharge > Condition = Verify Node; 
Node Status = Succeed.
10. Save the project.
11. Compile and simulate.
12. Download the application to the Terminal.
