Vectronics VEC-1320K User Manual
Page 21
VEC-1320K/1330K/1340K/1380K Owner's
Manual
19
Install at T1, laying flat--as shown below. Save unused portion of
insulated wire--you will need 4" of insulated wire later.
Primary
Link
! ! 17. Solder T1 in place.
! ! 18. Wind 12 turns of #22 enameled wire on a T50-2 toroid form. Spread
windings for 80% coverage, and install at L4 in an upright position.
! ! 19. Solder L4 in place.
! ! 20. Locate the 10.108 MHz crystal (metal can, two wire leads). Install at
Y1 and solder.
This completes stage 2 construction of the VEC-1330K 30-meter kit. After
checking for errors, you may now move on to the final stage of construction.
VEC-1340K 40-Meter Transceiver Kit
! ! 1. Find the 3.3 pF disc ceramic capacitor (3.3). Install at C13 and solder.
Locate two (2) 47 pF multilayer capacitors (47 or 470).
! ! 2. Install a 47 pF at C2 and solder.
! ! 3. Install a 47 pF at C15 and solder.
Locate two (2) 100 pF multilayer capacitors (101).
! ! 4. Install a 100 pF at C18 and solder.
! ! 5. Install a 100 pF at C25 and solder.
! ! 6. Find the 270 pF multilayer capacitor (271). Install at C14 and solder.
! ! 7. Find the 330 pF multilayer capacitor (331). Install at C23 and solder.