beautypg.com

Rt housing – SOR TA Nuclear Qualified Pressure Switch User Manual

Page 4

background image

4/4

Form 654 (04.13) ©SOR Inc.

14685 West 105th Street, Lenexa, KS 66215

 913-888-2630  800-676-6794 USA  Fax 913-888-0767

Printed in USA

www.sorinc.com

Cover Screws

1/8” NPT(F)
Vent Connection

Body

Process Connection

(Pressure Port)

Mounting Holes

3/4” NPT(F)
Conduit Connection

Mounting Hardware Fasteners per SOR Test Report 9058-102 consist of two 1/4-20,
Grade 5 screws (not supplied). Torque screws to 70 to 85 in-lbs.

Maintenance Replace cover gasket (SOR P/N 8923-181) whenever cover is removed or
minimum of once every 5 years, whichever comes first. Remove the four cover screws.
Remove old gasket. Place new gasket between housing and cover. Line up holes in cover,
gasket and housing. Insert the 4 screws and torque each to 7 to 10 in-lbs.

RT Housing

This manual is related to the following products: