Rt housing – SOR TA Nuclear Qualified Pressure Switch User Manual
Page 4
4/4
Form 654 (04.13) ©SOR Inc.
14685 West 105th Street, Lenexa, KS 66215
913-888-2630 800-676-6794 USA Fax 913-888-0767
Printed in USA
www.sorinc.com
Cover Screws
1/8” NPT(F)
Vent Connection
Body
Process Connection
(Pressure Port)
Mounting Holes
3/4” NPT(F)
Conduit Connection
Mounting Hardware Fasteners per SOR Test Report 9058-102 consist of two 1/4-20,
Grade 5 screws (not supplied). Torque screws to 70 to 85 in-lbs.
Maintenance Replace cover gasket (SOR P/N 8923-181) whenever cover is removed or
minimum of once every 5 years, whichever comes first. Remove the four cover screws.
Remove old gasket. Place new gasket between housing and cover. Line up holes in cover,
gasket and housing. Insert the 4 screws and torque each to 7 to 10 in-lbs.
RT Housing