beautypg.com

SOR TA Nuclear Qualified Pressure Switch User Manual

Page 3

background image

Form 654 (04.13) ©SOR Inc.

3/4

N6 Housing

TA Housing

Mounting Hardware Fasteners per SOR Test Report 9058-102 consist of three standard
grade 1/4-inch U bolts (not supplied).

Maintenance Replace cover o-rings (SOR P/N 8923-206 and 8923-207) whenever cover
is removed or minimum of once every 5 years, whichever comes first. Unscrew the cover.
Remove the old o-rings. Place new o-rings in groove of cover. Lubricate o-rings with light
film of Krytox 240AC grease (or equivalent fluorinated grease). Tighten cover until the
flange of the cover makes contact with the housing.

Cover

U-Bolts

3/4” NPT(F)
Conduit Connection

Process Connection (Pressure Port)

Body

1/4” NPT(F)

Vent Connection

Mounting Hardware Fasteners per SOR Test Report 9058-102 consist of two 1/4-20,
Grade 5 screws (not supplied). Torque screws to 70 to 85 in-lbs.

Maintenance Replace cover gasket (SOR P/N 8923-180) whenever cover is removed or
minimum of once every 5 years, whichever comes first. Remove the four cover screws.
Remove the old gasket. Place new gasket between housing and cover. Line up holes in
cover, gasket and housing. Insert the 4 screws and torque each to 7 to 10 in-lbs.

Cover Screws

1/8” NPT(F)
Vent Connection

Body

Process Connection

(Pressure Port)

Mounting
Holes

3/4” NPT(F)
Conduit
Connection

This manual is related to the following products: