Operating Manual Freeze Dryer BETA 1-8 LDplus / BETA 2-8 LDplus

Installation and Commissioning of the Unit 33

The filter is fastened to the exhaust flange of the vacuum pump.
The filter is equipped with a pressure relief valve indicating the
saturation of the filter. Cleaning or replacing of the filter insert must
be carried out at the latest when the pressure relief valve is
activated. The collected oil is visible in the inspection glass and is
drained via the discharging screw.
Please refer to separate operating manual of the vacuum
pump!

4.8. Initial Start-up

CAUTION! Ensure that the freeze-dryer is correctly mounted and
installed before initial start-up (see point 4.1 Site of Installation and
following points).