INSTALLATION

5.1.3

Removal of condensate

When the heat pump is operational, it will produce condensation
that needs to be drained off.

1

2

3

A

1

3

2

B

Key
A Confi guration with inclination to the left
B Confi guration with inclination to the right
1 Heat

pump

2 Plug
3 Drainage

elbow

• Insert the drainage elbow (3) and pipe into the correct

opening depending on the angle of the heat pump.

• Seal off the other opening with the supplied plug (2).

5.2 Boiler

circuit

5.2.1

Connection from the hydraulic module to
the boiler

i

Make the connection limiting the load losses to a
minimum (the circuit should be as short as possible,
avoid bends and narrow sections...).

i

Refer to the installation manual delivered with the
boiler for domestic hot water system connections.

4

5

1

2

3

Key
1

Flow boiler connection (Ø ¾")

2

Flow boiler tubing (not included)

3 Boiler
4

Return tubing leading to the boiler (not included)

5

Return connection (ؾ") leading to the boiler

• Connect a pipe (4) to the return connection (5) leading to the

boiler.

• Connect a pipe (2) to the fl ow connection (1) leading away

from the boiler.

• Refer to the boiler instructions to connect the pipes (2) and

(4) to the boiler.