Rt55 t4i operator’s manual – Ditch Witch RT55 User Manual
Page 80
RT55 T4i Operator’s Manual
Trench - 79
Setup
CMW
1.
Fasten and adjust seat belt.
2.
Start tractor. See page 62 for start-up procedures.
3.
Drive to starting point. Move in line with planned trench. See page 64 for operating procedures..
4.
Switch gearbox shift control to low.
5.
Lower backfill blade.
6.
Swivel seat to the desired position.
7.
Lower boom to just above ground.
8.
Engage optional Trench Depth Meter, if equipped. See page 109.
9.
Check that attachment speed/direction control and ground drive controls are in neutral.
10. Check that boom is in line with planned trench.
IMPORTANT:
•
When cutting asphalt, start trench in soil at edge of road and use shortest possible boom at
full depth.
•
For optimal spoils delivery, adjust the auger positions forward or backward to accommodate
terrain and digging depth.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)