Rt55 t4i operator’s manual – Ditch Witch RT55 User Manual
Page 33

Controls - 32
RT55 T4i Operator’s Manual
Right Console
CMW
2.
Backfill blade control
To lower blade, move
forward.
To put blade in float, move
fully forward.
To raise blade, move
backward.
To tilt right side of blade
down, move right.
To tilt left side of blade down,
move left.
3.
Backfill blade angle
control
To angle blade right, push.
To angle blade left, pull.
4.
Rear steer control
To turn rear wheels right,
push until wheels reach
desired position, then
release.
To turn rear wheels left, pull
until wheels reach desired
position, then release.
5.
Throttle
To increase engine speed,
push.
To decrease engine speed,
pull.
Item
Description
Notes
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)