Rt55 t4i operator’s manual – Ditch Witch RT55 User Manual
Page 129
Service - 128
RT55 T4i Operator’s Manual
10 Hour
Check Digging Chain Tension
Check digging chain tension every 10 hours. With boom horizontal, measure distance from bottom of
boom to chain. When properly adjusted, distance should be 1.5-2.0” (40-50 mm).
To tighten chain, remove plug and pump EPG into cylinder. To relieve chain tension, loosen plug on
grease cylinder.
Fluid pressure could pierce skin and cause injury or death. Stay away.
NOTICE: Service digging boom grease cylinder only while standing on opposite side of
boom. Wear gloves and safety glasses, and cover fitting with cloth when relieving pressure
in cylinder.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)