Restore jobsite, Backfilling, Rinse equipment – Ditch Witch RT55 User Manual
Page 115: Stow tools, Rt55 t4i operator’s manual

Complete the Job - 114
RT55 T4i Operator’s Manual
Restore Jobsite
CMW
Restore Jobsite
After product is installed, return spoils to the trench
with backfill blade.
Backfilling
1.
Position unit at end of trench, several feet from
spoils. Aim tractor at outer edge of spoils.
2.
Adjust backfill blade to fit land contour.
3.
Move outer edge of spoils toward trench. Take
two or more passes at spoils rather than moving
all spoils at once.
4.
Repeat on other side of trench, if necessary.
5.
Engage float and make final pass over trench.
Rinse Equipment
Spray water onto equipment to remove dirt and mud.
Stow Tools
Make sure all tools and accessories are loaded and properly secured on trailer.
NOTICE: Do not spray water onto operator’s console. Electrical components could be damaged. Wipe
down instead.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)