Plow, Rt55 t4i operator’s manual – Ditch Witch RT55 User Manual
Page 134

RT55 T4i Operator’s Manual
Service - 133
50 Hour
Check Nose Counterweight Bolts
Check tightness of nose weight bolts every 50 hours. Check for looseness or wear. Use the numbered
sequence shown to tighten bolts to 350 ft•lb (475 N•m).
Plow
Change Plow Vibrator Oil (Initial)
Change plow vibrator oil after first 50 hours of operation and every 500 hours. If normal ambient operating
temperature exceeds 100°F (38°C), change plow vibrator oil every 250 hours. To change:
1.
Open fill (2) to vent vibrator.
2.
Drain oil at drain plug (1).
3.
Replace plug and move plow vibrator to horizontal position.
Fill with MPL at fill (2) until oil is halfway up sight glass (3). Capacity is 3.5 qt (3.3 L).
IMPORTANT: Do not drain oil from plow vibrator when hot. Let vibrator cool before removing drain plug.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)