Planning, Trenching, Plowing – Ditch Witch RT55 User Manual
Page 53: Rt55 t4i operator’s manual

Operation Overview - 52
RT55 T4i Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 56.
2.
3.
Classify jobsite. See page 58.
4.
Select chain and teeth to match your soil type, if necessary. See page 109.
5.
Check supplies and prepare equipment. See page 60.
6.
Haul equipment to jobsite. See page 72.
Trenching
1.
2.
Position tractor and controls. See page 78.
3.
4.
Engage optional cruise control if desired. See page 108.
5.
Engage optional Trench Depth Meter if desired. See page 109.
6.
Complete the installation. See page 80.
7.
Backfill the trench. See page 114.
8.
Shut down tractor. See page 64.
Plowing
1.
2.
Position tractor and controls. See page 85.
•
•
•
3.
4.
5.
Engage cruise control if desired. See page 108.
6.
Complete the installation. See page 87.
7.