Restore jobsite, Rinse equipment, Stow tools – Ditch Witch RT Line User Manual
Page 71
Complete the Job - 70
RT12/RT16/RT20/RT24 Operator’s Manual
Restore Jobsite
CMW
Restore Jobsite
After product is installed, return spoils to the trench with optional backfill blade, shovels, or small earth-
moving equipment. See optional backfill blade on page 65.
Rinse Equipment
Spray water onto equipment to remove dirt and mud. Lubricate all zerks.
Stow Tools
Make sure all bits, pullback devices, and other tools are loaded and properly secured on trailer.
NOTICE: Do not spray water onto operator’s console. Electrical components could be damaged. Wipe
down instead.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)