Drive, Shut down – Ditch Witch RT Line User Manual
Page 40
RT12/RT16/RT20/RT24 Operator’s Manual
Drive - 39
Drive
CMW
Drive
1.
Disengage parking brake.
2.
Pull boom control to raise digging boom.
3.
Move throttle to 3/4 open.
RT12: Set throttle switch to high/full.
4.
Move speed/direction control in direction of preferred travel. Ground speed increases with control
movement.
Shut Down
1.
Release speed/direction controls.
2.
Push boom control to lower digging boom, if space allows.
3.
Run engine at low idle for three minutes to cool.
4.
Turn ignition switch to OFF position.
5.
Close fuel shut-off valve.
6.
Remove key.
NOTICE: Keep digging boom low when operating on a slope or transporting. Drive slowly and
cautiously at all times.
Improper control function could cause death or serious injury. If
control does not work as described in instructions, stop machine and have it
serviced.
NOTICE: Machine should not be parked on a slope unless chocked, blocked, or parking brake engaged.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)