Planning, Trenching, Leaving jobsite – Ditch Witch RT Line User Manual
Page 21
Operation Overview - 20
RT12/RT16/RT20/RT24 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 31.
2.
3.
Classify jobsite. See page 34.
4.
Select best chain type and tooth pattern for your application. See page 62.
5.
Consider optional equipment, if necessary. See page 64.
6.
Check supplies and prepare equipment. See page 36.
7.
Load unit onto trailer. See page 43.
Trenching
1.
Unload unit from trailer. See page 46.
2.
Leave optional backfill blade, if equipped, in stowed position with digging boom low to ground.
3.
4.
Drive to starting point of trench. See page 39.
5.
6.
Leaving Jobsite
1.
Restore the jobsite. See page 70.
2.
Rinse unit and stow tools. See page 70.
3.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)