Start unit – Ditch Witch RT Line User Manual
Page 39
Drive - 38
RT12/RT16/RT20/RT24 Operator’s Manual
Start Unit
CMW
Start Unit
1.
Check that all controls are in neutral.
2.
If necessary, use choke control to start cold engine.
3.
Move throttle to 1/4 open.
RT12: Set throttle switch to low.
4.
Turn ignition switch to START position to crank engine.
5.
Release key when engine starts.
6.
Run engine at half throttle or less for five minutes before operating trencher. During warm-up, check
that all controls work properly.
Explosion possible.
Using starting fluids will cause ignition in the intake manifold.
IMPORTANT: If engine does not start, turn ignition switch to OFF position and check for fuel
blockage or electrical system problems.
EMERGENCY SHUTDOWN: Release controls and turn ignition switch to OFF position.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)