beautypg.com

Unload – Ditch Witch RT Line User Manual

Page 47

background image

Transport - 46

RT12/RT16/RT20/RT24 Operator’s Manual

Tow

Unload

1.

Lower trailer or ramps.

2.

Remove tiedowns.

3.

Open fuel shut-off valve.

4.

Start engine.

5.

Disengage parking brake.

6.

Pull boom control to raise digging boom, but keep it as low as possible.

7.

Slow engine to low throttle and slowly back unit down trailer or ramps.

Tow

Under normal conditions, unit should not be towed. If unit breaks down and towing is necessary:

tow for short distances at less than 1 mph (1.6 km/h)

do not tow for more than 100’ (30 m)

use no more than 1,300 lb (5800 N) of towing force

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

NOTICE:

Unload unit with engine in low idle and boom as low as possible.

Unload trailer on level ground.

Attach trailer to vehicle before loading or unloading.

If trailer tilts, ensure that tilt latch is secured in the correct position.

NOTICE: If unloading from tilt-bed trailer, be prepared for trailer to tilt.