Ditch Witch RT Line User Manual
Page 53
Trench - 52
RT12/RT16/RT20/RT24 Operator’s Manual
Trench
7.
Push boom control to slowly lower digging boom to desired trench depth.
8.
Move speed/direction control slowly to desired speed.
9.
When trench is complete, release speed/direction controls.
10. Move throttle to half open.
11. Pull boom control to raise digging boom to top of trench.
12. Release digging chain control.
13. Reinstall backfill blade in work position for backfilling. After backfilling is completed, position blade in
upright “stowed” position for transporting, keeping digging boom low to ground.
14. Drive away from trench.
15. See page 39 for shutdown procedure.
IMPORTANT:
•
Do not make sharp turns. Lower boom to full depth when turning.
•
If an object becomes lodged in chain, move attachment speed/direction control to neutral and raise
boom slightly. Reverse chain direction. If object must be removed manually, turn engine off and
engage parking brake.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)