Test strike system, P80/pp25 operator’s manual – Ditch Witch P80 User Manual
Page 54
P80/PP25 Operator’s Manual
Push Rods - 53
Assemble Strike System
CMW
Test Strike System
If system fails any part of this test, see “Troubleshooting the Strike System” in MAINTENANCE. Do not
bore until test is completed successfully.
1.
Turn power switch on. Light above switch should come on.
2.
Check that Lo Main and Lo Backup lights are off.
3.
Press test button.
•
Horns on boring unit and power unit will sound.
•
Strobe lights on both units will flash.
•
Voltage and current hazard lights on alarm panel will light.
4.
Press reset button.
•
Strobes will stop flashing.
•
Green system lights will come on.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)