Connect to power, P80/pp25 operator’s manual – Ditch Witch P80 User Manual
Page 53
Push Rods - 52
P80/PP25 Operator’s Manual
Assemble Strike System
CMW
Connect to Power
1.
Connect 50 ft (15.3 m) cable to trailer and to control box.
2.
Plug power harness with alligator clips to strobe light on trailer.
3.
Connect alligator clips to power unit on battery.
Read operator’s manual. Know how to use all controls before operating
machine. When you see this sign
on the machine or in the manual, read it and use
caution. Your safety is at stake.
NOTICES:
•
Low main battery power will shut off control box. Backup battery only signals loss of main power.
Restore main power before continuing.
•
The electric strike system will work with low backup batteries but might not warn of main battery
system failure.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)