beautypg.com

P80/pp25 operator’s manual – Ditch Witch P80 User Manual

Page 39

background image

Transport - 38

P80/PP25 Operator’s Manual

Lift Points and Procedure

CMW

Trench Box

Lift trench box by attaching four chains to lift points
and to a common lift ring. Chains must be:

at least 80 in (2030 mm) fromlift points to lift
ring,

of equal length,

strong enough to bear 10,000 lb (44,500 N)
lifting force.

Maximum allowable lifting force is 20,000 lb
(89,000 N).

Trench Box with Extensions

Lift trench box with extensions by installing
extensions then connecting chains to trench box lift
points, as above.

Do not assemble or disassemble trench box and
extension when trench box is in trench.