P80/pp25 operator’s manual – Ditch Witch P80 User Manual
Page 39
Transport - 38
P80/PP25 Operator’s Manual
Lift Points and Procedure
CMW
Trench Box
Lift trench box by attaching four chains to lift points
and to a common lift ring. Chains must be:
•
at least 80 in (2030 mm) fromlift points to lift
ring,
•
of equal length,
•
strong enough to bear 10,000 lb (44,500 N)
lifting force.
Maximum allowable lifting force is 20,000 lb
(89,000 N).
Trench Box with Extensions
Lift trench box with extensions by installing
extensions then connecting chains to trench box lift
points, as above.
Do not assemble or disassemble trench box and
extension when trench box is in trench.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)