Back brace, P80/pp25 operator’s manual – Ditch Witch P80 User Manual
Page 46
P80/PP25 Operator’s Manual
Push Rods - 45
Setup
CMW
Back Brace
1.
Dig starting trench 18” (460 mm) wide and 72-99” (1830-2500 mm) long.
2.
Level and compact trench floors.
3.
Dig target trench deep enough to meet bore path and long enough to remove rod.
4.
Slide a rod through cylinder and install pilot head.
5.
Fasten chain and lift rod pusher in level position. Lower
unit into trench.
6.
Attach hydraulic control hoses to power unit hydraulic
manifold. Connect other hoses from hydraulic control
valve block to rod pusher.
7.
Align unit with intended bore path.
8.
Place a level on push rod at rear of unit. Adjust angle to
match grade of bore.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)