Ditch Witch JT1220 User Manual
Page 39
Controls - 38
JT1220 Mach 1 Operator’s Manual
Instrument Cluster
CMW
6.
Pipe lift status indicator
If pipe lifter is lifted fully and
lift pressure switch is
engaged, light should be on.
If pipe lift pressure switch is
not engaged, light should be
off.
7.
Front pipe box status
indicator
If active pipe column contains
pipe, light should be on.
If active pipe column does not
contain pipe, light should be
off.
IMPORTANT:
•
Check pipe box status lights to
see when active column of pipe
box is empty. See “Shift Pipe Box”
on page 143.
•
One light on and one light off
indicates a jammed pipe. See
“Correct Misaligned or Jammed
Pipe” on page 144.
8.
Rear pipe box status
indicator
If active pipe column contains
pipe, light should be on.
If active pipe column does not
contain pipe, light should be
off.
IMPORTANT:
•
Check pipe box status lights to
see when active column of pipe
box is empty. See “Shift Pipe Box”
on page 143.
•
One light on and one light off
indicates a jammed pipe. See
“Correct Misaligned or Jammed
Pipe” on page 144.
Item
Description
Notes