Connect drill pipe – Ditch Witch JT1220 User Manual
Page 102

JT1220 Mach 1 Operator’s Manual
Conduct a Bore - 101
Assemble Drill String
CMW
Connect Drill Pipe
1.
Start drilling unit engine.
2.
Align transition sub (3) in front wrench.
3.
Clamp tool in front wrench. See “Clamp Pipe” on page 98.
4.
Load pipe (4).
•
Make sure pipe box is positioned correctly.
•
Close grippers.
•
Lubricate upper pipe threads.
•
Move pipe to spindle. Verify that lower threads were lubricated as pipe moved to spindle.
•
Raise pipe in box.
5.
Connect pipe.
•
Move carriage forward until saver sub nears male pipe thread.
•
Slowly rotate spindle clockwise. Carriage will move forward as threads screw together.
•
Slowly move carriage forward until pipe end touches end of transition sub.
•
To screw pipes together and fully torque joint, slowly rotate drill pipe until spindle stops turning.
•
Open wrench.
•
Open grippers.
•
Retract shuttles fully.
•
Lower pipe lifters.
6.
Close guides.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)