Ditch Witch JT1220 User Manual
Page 111
Conduct a Bore - 110
JT1220 Mach 1 Operator’s Manual
Backream
CMW
1.
Select backreaming devices. See “Backreamers” on page 126.
2.
Determine fluid rate requirements and install appropriate nozzles to provide sufficient flow. See
“Backream Fluid Requirements” on page 127 and “Nozzles” on page 124.
3.
Attach backreamer to backream beacon housing if tracking backream.
4.
Install beacon, following beacon instructions for:
•
battery replacement
•
beacon positioning
5.
Install beacon housing lid. See “Beacon Housings” on page 125.
6.
Follow beacon instructions to check beacon operation.
7.
Follow tracker instructions to calibrate beacon.
8.
Connect EZ-Connect joint or use quick wrench to attach backreamer/beacon housing assembly to
transition sub. See “Quick Wrench” on page 129.
9.
Attach additional pullback devices or product to end of backreamer/beacon housing assembly.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)