Ditch Witch JT1220 User Manual
Page 25
Controls - 24
JT1220 Mach 1 Operator’s Manual
Set-Up Console
CMW
6.
Right stabilizer control
To raise, pull up.
To lower, push down.
IMPORTANT: Lower left and right
stabilizers to the ground to stabilize
unit and then adjust for side-to-side
stability. After unit is level, adjust for
entry angle.
NOTICE: Stand clear of right stabilizer
to avoid crushing your foot.
7.
Frame tilt control
To raise front end of drill
frame, pull up.
To lower front end of drill
frame, push down.
8.
Left stabilizer control
To raise, pull up.
To lower, push down.
IMPORTANT: Lower left and right
stabilizers to the ground to stabilize
unit and then adjust for side-to-side
stability. After unit is level, adjust for
entry angle.
NOTICE: Stand clear of right stabilizer
to avoid crushing your foot.
Item
Description
Notes
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)