Conair Hopper Temperature Controller UGD031 User Manual
Page 60

N o r m a l O p e r a t i o n To S t a r t H e a t i n g
1
Determine what the HTC’s setpoint must be for your process and material.
2
Make sure there is material in the hopper.
3
Start the dryer or process blower to begin air flow. Set the proper flow on
the blower if equipped.
4
Turn on the main power to the HTC
.
Make sure the HTC’s disconnect dial
is in the ON position. This powers up the control and the display lights will
illuminate.
5
Set the drying temperature. Press the Adjust Setpoint ▲ or t buttons to
select the temperature.
7
Turn the heater switch to “Enable” to start heating.
ON
O OFF
Heaters
Startup /
Shutdown
For Startup:
1. With heaters in
Standby, turn on
blower or dryer.
2. Enable heaters.
For Shutdown:
1. Switch heaters to
Standby.
2. Wait 60 seconds
before turning off
blower or dryer.
Enable
Standby
Setpoint Adjust
Buttons
4 - 2 4
l O p e r a t i o n