beautypg.com

Conair Hopper Temperature Controller UGD031 User Manual

Page 27

background image

3

Description

I n s t a l l a t i o n l

3 - 7

I n s t a l l i n g t h e I s o l a t i o n V a l v e s

NOTE: Isolation valves should be installed when multiple hoppers are connected

to a single dryer or blower.

1

Turn the disconnect dial on the control center door to the Off or “O” posi-
tion.
Lock out the main power (see Page 1-5 for complete lock out informa-
tion).

2

Install one isolation valve in the return air line. Secure the hoses on the
valve with hose clamps.

3

Install the other isolation valve in the delivery air line. Secure the hoses on
the valve with hose clamps.

ON

O OFF

This manual is related to the following products: