START-UP CHECKLIST
(Remove and Store in Job File)
I. Preliminary Information
MODEL NO.:____________
SERIAL NO.:____________
DATE:
TECHNICIAN:
II. PRE-START-UP (Insert checkmark in box as each item is completed)
() VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
() REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
() CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
() CHECK GAS PIPING FOR LEAKS (WHERE APPLICABLE)
() CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE
() VERIFY THAT UNIT INSTALLATION IS LEVEL
() CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS_______________________
INDOOR (EVAPORATOR) FAN AMPS___________
TEMPERATURES
OUTDOOR (CONDENSER) AIR TEMPERATURE
RETURN-AIR TEMPERATURE____________ DB _
COOLING SUPPLY AIR____________ DB_______
GAS HEAT SUPPLY AIR _____________
PRESSURES
GAS INLET PRESSURE________
GAS MANIFOLD PRESSURE —
REFRIGERANT SUCTION
__DB
WB
WB
JN.WG
--------IN. WG
PSIG SUCTION LINETEMP*_
‘ PSIG DISCHARGE TEMPt
REFRIGERANT DISCHARGE________
( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
GAS HEAT TEMPERATURE RISE
TEMPERATURE RISE (See Literature) RANGE______________
MEASURED TEMPERATURE RISE____________
( ) VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PROPERLY
( ) VERIFY THAT OUTDOOR AIR THERMISTOR (OAT) IS PROPERLY INSTALLED & CONNECTED
*Measured at suction inlet to compressor
tMeasured at liquid line leaving condenser.
Copyright 2008 Carrier Corp, • 7310 W, Morris St. • Indianapolis, IN 46231
Printed in U.S.A, Edition Date: 08/08
Catalog No:48XL-04SI
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Replaces: 48XL-3SI
36