Replacing diaphragms and valves – VACUUBRAND BVC professional G User Manual
Page 52

➨
Never operate the pump if covers or other parts of the
pump are disassembled.
➨
Before starting maintenance,
disconnect the electri-
cal power cord. Wait 5 seconds after isolating the
equipment from AC power to allow the capacitors to
discharge.
➨
Ensure that the pump cannot be operated accidentally.
➨
Note: The pump might be contaminated with the pro-
cess chemicals that have been pumped during opera-
tion. Ensure that the pump is decontaminated before
maintenance.
➨
Avoid the release of pollutants.
+
Never operate a defective or damaged pump.
+
Take adequate precautions to protect people from the
effects of dangerous substances that may have con-
taminated the pump and may be released upon dis-
assembly. Ensure that the maintenance technician is
familiar with the safety procedures which relate to the
products processed by the pumping system.
Use appropriate protective clothing, safety goggles and
protective gloves.
+
Check every motor capacitor regularly by measuring its
capacity and estimating its service life. Replace old ca-
pacitors early enough to prevent a failure. The capaci-
tors must be replaced by a trained electrician.
+
Allow sufficient cooling of the pump before starting
maintenance.
+
Vent the pump and isolate it from the vacuum sys-
tem before you start maintenance.
Replacing diaphragms and valves