Reznor Q6SP Option - Installation - Elec Heating User Manual
Page 12

12
Figure 3. Wiring Diagram 9 kw, 1-Stage, 240 VAC
NOTES:
1.
If
any
of
the
original
wire
supplied
with
this
unit
must be replaced, it must be replaced with wiring material of the sam
e
gauge
size
and
temperture
rating.
2.
The
installation of
this
heater kit
may
require a
change in
the
blower speed.
See
Installation Instructions for
details.
3.
Use copper conductors with minimum temperature rating of 60C
for
supply
connections.
Legend
Field Wiring
Factory Wiring:
Low
Voltage
High Voltage
L1
L2
L3
UNIT
TERMINAL BLOCK
GND
PLUG
HOUSING,
6
PI
N
SEQUENCER
PLUG HOUSING,
3
PI
N
L1
T1
L2
L3
T2
T3
CONTACTOR
LIMI
T
LIMI
T
BK
W/WH
BK
W/WH
RD
W/BK
RD
W/BK
YE
W/BK
YE
W/BK
BK
W/WH
RD
W/BK
YE
W/BK
WHITE
BLACK
WHITE
BLACK
WHITE
WHITE
BLAC
K
WHITE
GRAY
RED
RED
1
2
3
4
5
6
M1
M2
M3
M4
1
2
1
2
12
3
12
3
CAP HOUSING, 3 PIN
710098A
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)