Installation / performance checklist – Reznor Q6SE Unit Installation Manual User Manual
Page 20

IMPoRtAnt - This product has been designed and manufactured to meet ENERGY STAR criteria
for energy efficiency. However, proper refrigerant charge and proper air flow are critical to achieve
rated capacity and efficiency. Installation of this product should follow the manufacturer’s refrigerant
charging and air flow instructions. Failure to confirm proper charge and airflow may reduce energy
efficiency and shorten equipment life.
10064920 (NEW)
Specifications & illustrations subject to change
without notice or incurring obligations (12/14).
InStAllAtIon / PERFoRMAncE cHEcKlISt
REFRIGERAtIon SYStEM
Was unit given 24 hr warm up period
for crankcase heaters (if applicable)?
YES
NO
Stage-1 Liquid Pressure (high side) ________________________
Stage-1 Suction Pressure (low side) ________________________
InStAllER: PlEASE lEAVE tHESE
InStRUctIonS WItH tHE oWnER.
InStAllAtIon ADDRESS:
CITY ________________________ STATE ________________
UNIT MODEL # ________________________________________
UNIT SERIAL # ________________________________________
Unit Installed Minimum clearances per
YES
NO
InStAllER nAME:
CITY _______________________
STATE ________________
Has the owner’s information been
reviewed with the customer?
YES
NO
Has the Literature Package been left
with the unit?
YES
NO
VEntInG SYStEM
Is the vent hood installed?
YES
NO
Is vent hood free from restrictions
YES
NO
Filter(s) secured in place?
YES
NO
Filter(s) clean?
YES
NO
ElEctRIcAl SYStEM
Electrical connections tight?
YES
NO
Line voltage polarity correct?
YES
NO
Rated Voltage: ___________________________________ VOLTS
L1-L2 Volts: _____________________________________ VOLTS
Has the thermostat been calibrated?
YES
NO
Is the thermostat level?
YES
NO
Is the heat anticipator setting correct?
YES
NO