• The unit should be located with consideration of

minimizing the length of the supply and return ducts. If

practical, place the air conditioner and its ducts in an

area where they will be shaded from the afternoon sun,

when the heat load is greatest.

• The length of the supply and return ducts should be

kept to a minimum with no sharp radius bends.

• Overhead obstructions, poorly ventilated areas, and

areas subject to accumulation of debris should be

avoided. The hot condenser air must be discharged

up and away from the home, and if possible, in a

direction with the prevailing wind. Do not place the unit

in a confined space. See

Figure 9, (page 14)

for unit

dimensions.

• Sufficient clearance for unobstructed airflow through

the outdoor coil must be maintained in order to achieve
rated performance.

• Consideration should also be given to availability of

electric power, service access, noise, and shade.

Minimum clearance requirements

P8SE units are certified as cooling equipment for outdoor

installation only.

Figure 1

displays the minimum clearances

to obstructions for downflow and Horizontal discharge.

Units may be installed on Class A, B, or C roof covering

material when used with bottom supply and return air

ducts. If using bottom discharge with return air ducts, a

roof curb must be installed prior to unit installation. See

Rigging and Hoisting section for setting of the unit.
Sufficient clearance for unobstructed airflow through the

outdoor coil must be maintained in order to provide room

for proper servicing and achieve rated performance. See

Figure 1

for minimum clearances to obstructions.

Service Access Clearances

Blower access panel side ..........................................36”

Electrical compartment access panel side ................36”

Clearance between overhang & top of unit ...............72”

Clearance around condenser coil area to wall or

shrubs (excludes duct panel side) .............................36”

Duct Clearances

Supply and return air ducts .........................................0”

Duct connection side ...................................................0”

air ducts

This unit is designed only for use with a supply and return

duct. Air ducts should be installed in accordance with the

standards of the National Fire Protection Association

Standard for Installation of Air Conditioning Systems

(NFPA 90A), Standard for Installation of Residence Type

Warm Air Heating and Air Conditioning Systems (NFPA

90B), and all applicable local codes. NFPA publications

are avaialable by writing to: National Fire Protection

Association, Batterymarch Park, Quincy, ME 02269 or

visit www.NFPA.org on the web.
• Design the duct work according to methods described

by the Air Conditioning Contractors of America (ACCA).

• The ducts must be properly sized and not exceed .2”

W.C. pressure drop at 400 scfm per nominal ton of

cooling capacity.

general inForMation

Packaged air conditioner units are ready for easy and

immediate installation on rooftops or ground level slabs.

Units are shipped for horizontal duct connections and

can be easily converted for downflow applications. This

air conditioner is designed only for outdoor installations.
This unit has been designed and tested for capacity

and efficiency in accordance with AHRI Standards. This

unit will provide many years of safe and dependable

comfort, providing it is properly installed and maintained.

With regular maintenance, this unit will operate reliably

year after year. Abuse, improper use, and/or improper

maintenance can shorten the life of the appliance and

create unsafe hazards.

before You install this unit

√ The cooling load of the area to be conditioned must be

calculated and a system of the proper capacity selected.

It is recommended that the area to be conditioned be

completely insulated and vapor sealed.

√ Check the electrical supply and verify the power supply

is adequate for unit operation. If there is any question

concerning the power supply, contact the local power

company.

√ All units are securely packed at the time of shipment and

upon arrival should be carefully inspected for damage

prior to installing the equipment at the job site. Verify

coil fins are straight. If necessary, comb fins to remove

flattened or bent fins. Claims for damage (apparent or

concealed) should be filed immediately with the carrier.

√ Please consult your dealer for maintenance information

and availability of maintenance contracts. Please read

all instructions before installing the unit.

locating the air conditioner

• Survey the job site to determine the best location for

mounting the outdoor unit. Select a solid, level position,

preferably on a concrete slab, slightly above the grade

level, and parallel to the home. If possible, select a site

for the unit that is as close as possible to the proposed

return grille location. DO NOT PLACE UNIT UNDER

THE HOME.

Minimum Required

Clearances to Obstructions

0"

36"

36"

36"

TOP OF UNIT

TO

BE

UNOBSTR

UCTED

36” For Coil Only