Figure 10. typical air conditioner thermostat, Connections (208/230v) – Reznor P8SE Unit Installation Manual User Manual
Page 15

15
R
Y
C
G
W
1
2
3
4
5
6
7
8
9
Gray
Yellow
Blue
ECONOMIZER PLUG
INDOOR
THERMOSTAT
SUB-BASE
1
2
3
4
5
6
7
8
9
Brown
Orange
ACCESSORY
HEAT PLUG
C
W1
R
Y2
Y1
G
TERMINAL
STRIP
Red
Black
Green
FROM TRANSFORMER
FROM CONTACTOR - Optional
(Check T-stat Instructions)
FROM BLOWER RELAY
typical Wiring (Field Supplied) for 1-Stage cool, 1-Stage Heat
typical Wiring (Field Supplied) for 2-Stage cool, 1-Stage Heat with an optional outdoor thermostat
Figure 10. typical air conditioner thermostat connections (208/230v)
Optional Outdoor T-Stat
(Field Supplied)
R
Y2
C
G
W1
1
2
3
4
5
6
7
8
9
Gray
Yellow
Blue
ECONOMIZER PLUG
INDOOR
THERMOSTAT
SUB-BASE
1
2
3
4
5
6
7
8
9
Brown
Orange
ACCESSORY
HEAT PLUG
C
W1
R
Y2
Y1
G
TERMINAL
STRIP
Red
Black
Green
FROM TRANSFORMER
FROM CONTACTOR - Optional
(Check T-stat Instructions)
FROM BLOWER RELAY
Y1
W2
See also other documents in the category Reznor Radiators:
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)