Mpg113md instructions #5, Malone – Malone MPG113MD User Manual
Page 6
. After the kayak has been loaded onto the
carriers, loosen the two Extension Frame
T-knobs and push the Extension Frame back
until the V-Block makes contact with the
kayak. Tighten the T-knobs for transport.
See image 22.
. Lift the rear of the kayak and slowly push forward
until the kayak is centered between the carriers.
See image 21.
. Lift and place the front of the kayak into
the V-Block on the Extension Frame. Walk
to the rear of the kayak while continuing
to hold the kayak in place. See image 20.
MALONE
R
Installation & Loading Instructions - MPG113MD SS Combo
TM
19
. Loosen the two T-knobs holding the Extension
Frame. Pull the Frame out to the rear edge of
the vehicle and slightly re-tighten the T-knobs.
See image 19.
Note: The Extension Frame will bend down under
the weight of the kayak. The Frame should be
placed so that the rubber pad makes contact with
the vehicle’s rear edge. This will provide support
and protection while the kayak is loaded.
20
22
21