beautypg.com

Mpg113md instructions #5, Malone – Malone MPG113MD User Manual

Page 6

background image

. After the kayak has been loaded onto the

carriers, loosen the two Extension Frame

T-knobs and push the Extension Frame back

until the V-Block makes contact with the

kayak. Tighten the T-knobs for transport.

See image 22.

. Lift the rear of the kayak and slowly push forward

until the kayak is centered between the carriers.

See image 21.

. Lift and place the front of the kayak into

the V-Block on the Extension Frame. Walk

to the rear of the kayak while continuing

to hold the kayak in place. See image 20.

MALONE

R

Installation & Loading Instructions - MPG113MD SS Combo

TM

19

. Loosen the two T-knobs holding the Extension

Frame. Pull the Frame out to the rear edge of

the vehicle and slightly re-tighten the T-knobs.

See image 19.

Note: The Extension Frame will bend down under

the weight of the kayak. The Frame should be

placed so that the rubber pad makes contact with

the vehicle’s rear edge. This will provide support

and protection while the kayak is loaded.

20

22

21