Test Weight Chamber Volume
1. Select Setup (F3)>Hardware Setup>Classic GrainGage Setup>Chamber Volume.
2. Default values for the chamber volume are as follows.

Chamber Size Cubic Inches Cubic cm.

3.5 liter

209

3441

1.5 liter

89

1458

¾ liter

40

655

3. Cycle a grain sample, with a known test weight, through the GrainGage.
4. Grain sample needs to be large enough for at least three full cycles. (15-18 lb. for a three liter chamber, 8-9 lb. with a 1.5 liter, & 5 lb.

with a ¾ liter.)

5. Run the sample though the GrainGage in harvest mode three to five times and average the readings.
6. Calculate the new test weight chamber by using the following the formula:

New Chamber Volume =Measured Test Weight / Actual Test Weight * Chamber Volume

7. Enter the new Chamber Volume value and press Save (F4).
Level Detect Settings
1. Select Setup (F3)>Hardware Setup>Classic GrainGage Setup>Level Detect.
2. The Open and Close levels are settings that determine the amount of grain in the hopper needed to trigger the GrainGage to cycle. The

higher the level setting the more grain required to start the cycle sequence. Open and Close Level should never be set lower than 5.0.

HM 800 Default Settings

Open Level – 10.0

Close Level – 10.0

Hopper Delay – 3.0

Timer Settings
1. Select Setup (F3)>Hardware Setup>Classic GrainGage Setup>Timers.

• Open State Time—Value indicates how long each gate will remain open allowing grain to flow through.
• Clear Delay—When the level of the grain is no longer high enough to trigger the Open Level and Close Level settings, the Clear

Delay starts. When the Clear Delay timer expires the system can process a end-of-cycle sequence. The Clear Delay starts after

pressing ENTER to save the data.

• Weigh Time—The amount of time data is collected and averaged to determine the actual weight reading.

HM 800 Default Settings

Open State Timer – 0.6

Clear Delay Timer – 1.0

Weight Time – 0.8

Classic GrainGage Maintenance Checklist

Item

Process

Start System

First, start the combine. Next, turn on HarvestMaster System Console (Handheld should turn on automatically).

Finally, load FRS.

Air Pressure

Air pressure should be set 60 –80 psi.

Air Leaks

If you have a reservoir air tank, turn off the combine after filling the tank. Check for air leaks on all cylinders

and solenoids. Also check solenoid exhaust port plugs for any build-up of oil or debris. If they are caked in

debris, take the exhaust port out and clean with Brake & Parts Cleaner.

Cable Connections

Ensure all cable connections are tight and there is not any debris in the connections.

Be careful when reconnecting the cables not to bend or damage any connector pins.

Debris

Blow out the GrainGage at the end of every day. DO NOT use a high-pressure washer to clean system.

Bucket Clearance

The plot bucket should be sitting firmly on the load cell tracks. Check to ensure that all cables and air hoses are

not touching the bucket. Also, check the clearance around the bucket.

Actuators Cycle Smoothly Make sure all cylinders open and close smoothly.

Weight System

Place a known weight (not exceeding 5lb./2.27 kg) onto the weigh pan. Verify that the system reads the same

weight. Remove weight and verify the system zeros out.

Calibrate Weight System

Procedure is in the Manual (CGG pg. 21)

Calibrate TW Chamber Vol.

Procedure is in the Manual (CGG pg. 39)

Calibrate Slope and

Motion

Procedure is in the manual (CGG pg. 22)

Calibrate Moisture Curve

Procedure is in the manual (CGG pg. 29)

For questions, concerns, or comments
Please contact HarvestMaster:
During Office Hours: (435) 753-1881

After Office Hours: (435) 757-5354
Email: [email protected]
P/N 11529-03