
10
35. Seat the shifter boot (2) onto the console bezel (1) and
seat fully.
36. Connect the HVAC control cables (1 and 9) and con-
nect the electrical connectors (3 and 4).
37. Position the center bezel (1) onto the I/P and seat the
clips fully.
38. Install the lower screws (2).
Aug 08, 2008
K6860631 Rev. 1