8 tube connections, 1 connection scheme, Tube connections – BUCHI Rotavapo R-215 User Manual
Page 37: 5 .8 tube connections
5 Putting into operation
37
R-210/215 Operation Manual, Version F
5 .8
Tube connections
5 .8 .1
Connection scheme
3
4
2
6
4
1
7
8
9
5
8
a Mains connection
b Communication vacuum controller/Rotavapor
c Communication vacuum pump/Rotavapor
d Communication temperature sensor
e Vacuum connection controller/Woulff bottle or valve
unit (only if no Vacuum Pump V 700/710 is used)
f Inert gas connection
g Cooling water connections
h Vacuum connection glass assembly/valve unit or
Woulff bottle
i Connection evaporating flask feed via stop-cock
Fig. 5.8: Tubing scheme
This manual is related to the following products: