beautypg.com

Brookfield DV-III Rheometer User Manual

Page 7

background image

- 7 -

4) Select the ribbon cable end with the adjacent, heavy, black mass. Insert this end of the

ribbon cable into the DV-III Rheometer head. Insert the other end of the ribbon cable into
the connector on the DV-III base (see Figure 3).

100-240 VAC 50/60 HZ 220VA

MODEL DV-III BASE UNIT

240 CUSTHING ST.

STOUGHTON, MA USA 02072

APPROVED POUER SUPPLY

TUV RHEINLAND

LICENSE NO. R9051346

RECOGNIZED COM,PONENT

UL FILE NO. D 122103

NOTE

ANALOG OUTPUTS

ON SERIAL I/0

CONNECTOR

A.C. Power

Connector

A.C. Fuse

Power ON/OFF

Switch

RTD Temperature

Probe Connector

Ribbon Cable

Connector

RS-232 Serial

Printer/Computer
Analog Output(s)

Ribbon Cable

Connector

Figure 3

5) Connect the RTD probe to the socket on the back side of the DV-III Rheometer (Figure 3).

6) The Rheometer must be leveled before the instrument is zeroed and readings are taken. The level

is adjusted using the three leveling screws on the base. Adjust so that the bubble level on top
of the DV-III (Figures 1, 2) is centered within the circle.

7) Make sure that the AC power switch at the rear of the base unit is in the OFF position. Connect

the AC plug to the socket on the back of the DV-III base and plug it into the appropriate AC line.

The DV-III must be earth grounded to ensure against electronic failure!!

8) Temperature monitoring is assured (after the instrument has stabilized) to within

±

1.0

°

C in the

range -100

°

C to +150

°

C and within 2

°

C in the range 150

°

C to 300

°

C.

9) For Cone/Plate models refer to Appendix A.

(s)

Rheometer Head