beautypg.com

Bradford White DB-80R3DS User Manual

Page 31

background image

WARNING

High voltage exposure. Use caution to avoid

personal injury during this procedure.

Illustration 47

Illustration 48

Double Element, Simultaneous, Three Phase

Operation.

Water In Tank Is Cold Or Not Enough Hot

Water With Power ON.
1. This procedure assumes line voltage,

ECO and elements are in working order.

2. Adjust temperature setting for both

thermostats to the highest setting.

3. Turn power “ON” to water heater.
4. Set multi-meter to “Volts AC”
5. Check across terminals L4 and T2 of

upper thermostat (see illustration 47).

A) Rated voltage NOT present,

Recheck upper ECO

(see page 14). If ECO

is okay, replace upper thermostat.

B) Rated voltage IS present,

proceed to next step.

6. Check across upper element terminals

(see illustration 48).

A) Rated voltage NOT present,

check wire connections from

thermostat to upper element.

B) Rated voltage IS present,

Repeat element testing

see page 15

7. Check across terminal L4 of upper thermostat

and T2 of lower thermostat (see illustration 49).

A) Rated voltage NOT present,

Check ECO (see page 14) & wire

connections at upper & lower

thermostats. If okay, replace

lower thermostat.

B) Rated voltage IS present,

proceed to next step.

8. Check across lower element terminals

(see illustration 50).

A) Rated voltage NOT present,

check lower element wire

connections to thermostat.

B) Rated voltage IS present,

Repeat lower element testing

see page 15.

Illustration 49

WARNING

Be sure thermostats are reset to

their original temperature settings

as found prior to thermostat

testing

Illustration 50

Page 31

SERVICE PROCEDURE RE-IV

Light Duty Commercial

Thermostat Testing

31